Availability/Downtime Calculator
    Scheduled Production Time (hr.)
    Actual Production Time (hr.)
    Availability %
    Downtime %
    Maximum Line Speed (cpm)
    Possible Containers Produced
    Case Type (6,12,24 pack)
    Total Possible Cases Produced
    Production Cost Per Case ($)
    Shift Production Value
    # of Shifts
    # of Production Days
    Total Value of Production (1 yr.)